After the replacement is completed, wait for five minutes for the battery to initialize.
HNAS-4060:$ ver HNAS-4060:$ new-battery-fitted --field --confirm HNAS-4060:$ batt-log-show ... 2025-04-17 14:17:21+08:00 Battery exceeded life expectancy: 749 days since fitted, life expectancy is 730 days 2025-04-18 05:13:23+08:00 Voltage 7.77V, Current -0.01A, glue reg: 0xc1 2025-04-18 06:14:23+08:00 Voltage 7.76V, Current -0.01A, glue reg: 0xc1 2025-04-18 06:47:56+08:00 **** Battery not fitted! **** 2025-04-18 06:48:40+08:00 **** Battery is fitted **** 2025-04-18 06:48:40+08:00 Battery was disabled but has now been enabled 2025-04-18 06:52:05+08:00 **** Battery monitor starting release 11.2.3319.16 **** 2025-04-18 06:52:05+08:00 **** Battery is fitted **** 2025-04-18 06:52:06+08:00 MCP card id is 2 and revision is 10 2025-04-18 06:52:06+08:00 State changed to: Initializing 2025-04-18 06:52:06+08:00 Voltage 7.86V, Current -0.01A, glue reg: 0xc1 2025-04-18 06:52:07+08:00 Detected new battery, so need to set fitted date and initiate a conditioning cycle 2025-04-18 06:52:07+08:00 State changed to: Conditioning-1 2025-04-18 06:52:07+08:00 Voltage 7.86V, Current -0.01A, glue reg: 0xc1 2025-04-18 06:52:07+08:00 Conditioning cycle 1 start HNAS-4060:$ HNAS-4060:$ batt-show Battery is fitted, Conditioning 1 Discharging, 7.16V, 2.07A Fault state: 0x4 (fault) HNAS-4060:$ HNAS-4060:$ status Power supply status: Unit 1: OK Unit 2: OK
Chassis battery status: Unit 1: Fault
Board temperature: MMB CPU Core 0 sensor: OK (26 C) MMB CPU Core 1 sensor: OK (34 C) MMB CPU Core 2 sensor: OK (29 C) MMB CPU Core 3 sensor: OK (28 C) MFB Inlet sensor: OK (30 C) MFB Outlet sensor: OK (27 C) MSM Board sensor: OK (29 C)
Fan status: Chassis fan 1: Fitted Speed: OK (3100 rpm) Chassis fan 2: Fitted Speed: OK (3100 rpm) PSU1 fan: Fitted Speed: OK (13200 rpm) PSU2 fan: Fitted Speed: OK (13600 rpm)
Chassis disk status: md0: OK 5% full. md1: OK 4% full. md2: OK 0% full. md3: OK 3% full.
Ethernet Aggregations: ag1: Up
FC Links: FC 1: Up FC 2: Up FC 3: Up FC 4: Up
Server uptime: 366 days, 1 hour, 57 minutes, 56 seconds Server date/time: 2025-04-18 07:03:05+08:00 HNAS-4060:$
If this LED is on immediately after installing a new battery pack, it indicates that an initial battery charging and conditioning cycle is in progress. The initial battery conditioning takes approximately 24 hours, and the LED will turn off after the cycle is complete.